Establish the baseline
Record starch quantities, purchase prices, batch output and quality.
Enter your baselineUnderstand your cost saving
A useful comparison includes the additive cost, your actual purchase rates and acceptable production output.
The standard 500 kg planning example
| Measure | Calculation | Result |
|---|---|---|
| Starch saved / batch | 500 kg × 25% | 125 kg / 2.5 × 50 kg bags |
| Gross starch cost saved | 125 kg × PKR 150/kg | PKR 18,750 |
| Enzyme cost | 8 kg × PKR 1,350/kg | PKR 10,800 |
| Net saving / batch | 18,750 − 10,800 | PKR 7,950 |
| Daily saving | 7,950 × 18 batches | PKR 143,100 |
| Monthly saving | 143,100 × 30 days | PKR 4,293,000 |
| Annual projection | 4,293,000 × 12 months | PKR 51,516,000 |
These editable inputs are a reference example, not current quotations. Annual projections repeat the entered monthly basis. Taxes, freight, finance and unentered changes are excluded.
Keep the comparison transparent
Record starch quantities, purchase prices, batch output and quality.
Enter your baselineEnter the dose, enzyme price and any additional process cost.
Compare full material costsAgree quality criteria and verify performance in a controlled trial.
Discuss a trialFrom 25% to 35%
Our standard planning basis is 25% starch reduction. The calculator allows trial scenarios up to 35%; achievable reduction and enzyme dose depend on the mill.
Let’s talk production
Share your current recipe or sizing requirements. Let’s plan the next step.